Building a 5 Marla house in Lahore is a major investment, and one of the first questions homeowners ask is: How much does it cost to construct a 5 Marla house in Lahore?
The answer depends on several factors, including the covered area, number of floors, grey structure specifications, finishing quality, construction location, material prices, labour rates, architectural design, and the type of fittings and fixtures selected.
For this reason, there is no single construction price that applies to every 5 Marla house.
In this guide, PPS Constructions explains the major costs involved in constructing a 5 Marla house in Lahore, including grey structure, finishing, materials, labour, covered area, construction stages, and factors that can increase or reduce your budget.
Last Updated: September 2026
For planning purposes, current 2026 market guides show that the cost of a 5 Marla house in Lahore can vary considerably depending on the specification and covered area.
For a double-storey 5 Marla house, published 2026 estimates commonly place grey-structure costs in a broad range of roughly PKR 52 lakh to PKR 75 lakh, while a standard complete/turnkey house can range approximately from PKR 1.05 crore to PKR 1.70 crore or more depending on specifications.
These figures should be treated as planning ranges, not a quotation from PPS Constructions. A project-specific estimate requires the actual drawings, covered area, location, soil conditions, specifications, and selected materials.
A construction budget is normally divided into two major stages:
The total budget can then be affected by architectural design, approvals, utility connections, external works, boundary walls, landscaping, and other project requirements.
| Construction Stage | What It Generally Includes |
|---|---|
| Grey Structure | Foundation, columns, beams, brickwork, slabs, masonry and basic structural work |
| Electrical & Plumbing Rough Work | Conduits, pipes and related concealed work |
| Plastering | Internal and external plaster where included |
| Flooring & Tiles | Floor tiles, wall tiles and related installation |
| Doors & Windows | Main door, internal doors, aluminium/uPVC windows, etc. |
| Kitchen | Cabinets, countertop, sink and fittings according to specification |
| Bathrooms | Sanitary ware, tiles, faucets and accessories |
| Electrical Finishing | Switches, sockets, lights and related fixtures |
| Paint | Putty, primer and paint |
| Woodwork | Wardrobes, cabinets and other carpentry |
| Exterior | Elevation treatment, boundary wall and other external works |
The exact inclusions should always be defined in a BOQ, construction agreement or detailed scope of work.
One of the most important points when calculating construction cost is understanding the difference between plot size and covered area.
A 5 Marla plot does not necessarily mean that the house has 5 Marla of covered area.
For a double-storey house, the total covered area is calculated by adding the covered floor area of each storey.
For example:
Ground Floor Covered Area + First Floor Covered Area = Total Covered Area
Current published Lahore estimates use covered areas around 1,800–2,200 sq. ft. for some double-storey 5 Marla projects, while other designs and societies may produce different areas.
Therefore, construction should be budgeted according to the actual covered area and project drawings, not simply the plot size.
Grey structure is the structural phase of construction.
It generally includes work such as:
Current 2026 online construction estimates for Lahore show grey-structure rates varying significantly, with examples around PKR 3,000–3,600+ per sq. ft. and project-specific totals depending on covered area and specifications.
Suppose a particular 5 Marla double-storey design has approximately 2,000 sq. ft. covered area.
If the project-specific grey-structure rate is:
PKR 3,200 per sq. ft.
Then:
2,000 × PKR 3,200 = PKR 6,400,000
That equals approximately:
PKR 64 lakh
This is an illustrative calculation only, not a fixed PPS Constructions rate.
Once the grey structure is complete, the house requires finishing and installation work before it becomes ready for occupation.
Depending on the specification, the finishing budget can include:
The finishing cost can vary significantly depending on whether you select economy, standard, premium or luxury materials.
Instead of using one fixed construction price, homeowners should establish a specification level.
| Specification | Typical Characteristics |
|---|---|
| Economy | Basic but functional materials and fittings |
| Standard | Better-quality tiles, sanitary, electrical and finishing materials |
| Premium | Higher-grade materials, fittings and customized work |
| Luxury | Premium/imported materials, customized interiors and high-end fixtures |
For example, two houses with exactly the same covered area can have very different total construction costs if one uses standard local tiles and fittings while the other uses premium or imported products.
The exact quantities depend on the architectural and structural drawings, but a typical house construction project requires materials such as:
PPS Constructions recommends estimating quantities from the actual project drawings rather than relying on generic online quantities.
Several factors can change the final construction budget.
This is one of the most important cost drivers.
A larger covered area means more:
A single-storey house generally has a smaller total covered area than a double-storey house on the same plot.
A double-storey design increases the total construction area and therefore the overall construction budget.
Adding a basement can substantially increase the cost because it involves:
Therefore, a 5 Marla house with a basement should be estimated separately.
The selection of materials has a major effect on the final cost.
For example:
Steel and cement are important components of the structural construction budget.
Because market prices can change, construction estimates should be updated before procurement.
Different brick qualities and suppliers can have different prices.
PPS Constructions recommends checking:
Read our related guide:
Brick Rates in Pakistan: Types, Quality, Prices & Factors
Construction costs can vary between different areas because of:
The final cost for a 5 Marla house in DHA Lahore may therefore differ from a project in Bahria Town Lahore, Bahria Orchard, Lake City, Etihad Town or another area.
PPS Constructions currently provides construction services across Lahore and highlights areas including Bahria Town Lahore, Bahria Orchard Lahore, Lake City Lahore, Etihad Town, Al-Kabir Town and DHA.
There is no reliable single rate that applies to every housing society.
For an accurate estimate, the following should be considered:
| Factor | Why It Matters |
|---|---|
| Society | Rules and construction requirements can differ |
| Plot Dimensions | Affects design and covered area |
| Covered Area | Main basis for many construction calculations |
| Number of Floors | More floors generally mean more construction |
| Basement | Adds excavation and structural costs |
| Material Specification | Directly affects material budget |
| Labour | Labour rates vary by project and scope |
| Transportation | Affects delivered material cost |
| Finishing | Can significantly change the total budget |
Construction duration depends on the project scope, design, approvals, workforce, material availability, weather and finishing specifications.
A house project generally progresses through stages such as:
A realistic project schedule should be prepared after reviewing the actual drawings and scope of work.
Reducing cost does not necessarily mean choosing the cheapest materials.
Instead, focus on proper planning and cost control.
Changes during construction can increase labour and material costs.
A Bill of Quantities helps identify the required materials and work items.
Compare suppliers based on both price and quality.
Proper storage and supervision can reduce unnecessary waste.
Decide early where standard materials are sufficient and where premium materials are important.
Regular supervision can help identify quality and execution problems early.
Frequent changes can increase both material and labour costs.
Many homeowners make the mistake of calculating their budget from a single per-square-foot figure.
Here are some common problems:
Construction costs should generally be calculated using the actual construction/covered area relevant to the scope.
Some estimates focus only on grey structure and underestimate the cost of making the house move-in ready.
The difference between economy and premium finishing can be substantial.
Depending on the project, external works can include:
Construction material prices change. An estimate prepared months earlier may no longer represent the current market.
Before construction begins, define what is included and excluded from the contractor’s scope.
| Feature | Grey Structure | Turnkey Construction |
|---|---|---|
| Foundation | ✓ | ✓ |
| Structure | ✓ | ✓ |
| Brickwork | ✓ | ✓ |
| RCC Slabs | ✓ | ✓ |
| Basic MEP Work | Depending on scope | ✓ |
| Flooring | ✗ | ✓ |
| Paint | ✗ | ✓ |
| Kitchen | ✗ | ✓ |
| Sanitary Fittings | Usually ✗ | ✓ |
| Doors & Windows | Usually limited/not included | ✓ |
| Electrical Fixtures | ✗ | ✓ |
| Move-in Ready | ✗ | ✓ |
The exact scope should be confirmed in the project agreement because construction packages can differ between contractors.
An online article can provide a useful budgetary estimate, but it cannot replace a project-specific quotation.
A proper 5 Marla construction estimate should consider:
PPS Constructions can prepare a project-specific estimate after understanding the actual requirements of the property.
The cost varies according to covered area, floors, location, materials and finishing. Current published Lahore estimates indicate broad planning ranges from roughly PKR 52–75 lakh for grey structure and approximately PKR 1.05–1.70 crore or more for complete construction, depending on project specifications.
There is no single fixed rate. Current 2026 estimates vary according to covered area and specifications, with published examples ranging from approximately PKR 52 lakh to PKR 75 lakh for certain double-storey 5 Marla projects.
A standard turnkey 5 Marla house can vary substantially depending on covered area and finishing specifications. Current published estimates range broadly from around PKR 1 crore to PKR 1.7 crore+. Premium specifications can increase the budget further.
Not directly. Construction estimates are generally based on the covered/construction area, while plot size determines the available site and design constraints.
Generally, yes, because a double-storey house normally has a greater total covered area and requires additional structural and finishing work.
Yes. A basement normally requires additional excavation, structural work, waterproofing, drainage and other construction requirements.
Grey structure is only the structural phase. Turnkey construction includes grey structure plus finishing and installation work, so the total turnkey budget is substantially higher.
Yes, but the design, covered area, material specifications and finishing level need to be planned around the available budget before construction begins.
The most accurate approach is to provide the construction company with the plot location, architectural drawings, covered area, number of floors, basement requirements and desired material/finishing specifications. A detailed BOQ and project quotation can then be prepared.
Planning to build your 5 Marla house in Lahore?
PPS Constructions provides construction services including grey structure, turnkey construction and finishing work. The company is based in Lahore and works across several major housing societies and residential areas.
Instead of relying on a generic online construction rate, get your project evaluated according to its actual:
Contact PPS Constructions for a project-specific 5 Marla house construction estimate and discuss your construction requirements.